Energia Pecém Thermoelectric Power Plant
Our Story

Located in the Pecém Industrial and Port Complex (CIPP), in São Gonçalo do Amarante, the Energia Pecém thermoelectric plant is fundamental to the energy system of Ceará and the Northeast. With 720 MW of installed capacity — about half of the state's electricity generation — it guarantees safe and reliable energy for millions of people.

The project began in 2008, as part of the Growth Acceleration Program (PAC), with an investment of R$ 3 billion (base 2010) and financing from the BNDES and the IDB. The first unit came into operation in December 2012 and the second in May 2013, each with 360 MW.
‍
With an annual capacity of up to 5,500 GWh, the plant can supply a city of approximately 5.6 million inhabitants. Its operation marked the transition of Ceará from importer to exporter of energy.
‍
Currently under the control of Diamante Energia, UTE is undergoing studies to convert to natural gas, reinforcing its strategic role and commitment to a more sustainable matrix.

The first unit came into operation in December 2012 and the second in May 2013, totaling 720 MW of installed capacity, which corresponds to almost half of Ceará's electricity generation.

Originally powered by mineral coal, the plant marked the state's transition from importer to exporter of energy. Currently, under the control of Diamante Energia, UTE is undergoing studies to convert to natural gas, reaffirming its strategic role in the energy scene in the Northeast.

Fundamental to energy security. Transforming coal into power, innovation and development for Ceará and the Northeast.

A usina possui contratos de comercialização de energia que combinam receita fixa, reajustada anualmente pelo IPCA, e receita variável, destinada à cobertura dos custos de combustível e de operação e manutenção quando há despacho pelo Operador Nacional do Sistema Elétrico (ONS).

Contratada no leilão A-5 da ANEEL, em 2007, com 315 MW médios, a usina possui contrato vigente até dezembro de 2027. Em 2026, foi recontratada no Leilão de Reserva de Capacidade (LRCAP), com 312 MW por dez anos, a partir de agosto de 2031.
Timeline
2007
Approved project
Launch of the plant project under the Growth Acceleration Program (PAC), with investments of R$ 3 billion financed by BNDES and IDB.
2009 to 2011
Construction began at the Pecém Industrial and Port Complex (CIPP), boosting employment, economic development and innovation in the region.
2012
The first generating unit, with 360 MW, begins its commercial operation authorized by ANEEL.
2013
Second unit in operation
The second unit comes into operation, bringing the plant's total capacity to 720 MW.
As of 2013
Ceará ceases to be an importer and is now consolidating itself as an energy exporter, expanding its importance in the national electricity system.
2026
UTE Porto do Itaqui passa a fazer parte dos ativos da Diamante Geração de Energia.
Power and future for the Northeast
Located in the Pecém Industrial and Port Complex (CE), the 720 MW power plant guarantees almost half of Ceará's electricity generation and reinforces energy security in the region.
integra o subsistema Norte do Sistema Interligado Nacional (SIN).
1
usina
1 unidade geradora
360 MW
Capacidade Instalada
150
empregados diretos
720 MW
Installed capacity
99.2%
Availability in 2024
37.3 TWh
Total energy produced from 2012 to 2024
+1300
Qualified jobs
+ R$ 80M
Invested in research and development
Work where innovation and responsibility meet
We believe that the future is built by committed people. We are looking for talent for our operations, people who value ethics, collaboration, and the desire to transform challenges into opportunities.
Learn more